Lauren’s Bathroom
January 8, 2013

A failed shower pan caused the whole subfloor to rot under this master bath.  We stepped in to rebuild the shower pan, platform and benches and bathroom floor.  The damaged extended two feet up on the shower walls so matching the previous tile work and grout was imperative.  A custom created pebble mosaic was added to the platform area as well as a new pebble shower floor.  Heating mats were also installed under the 16″ porcelain tile floor to warm feet during cold months.  We installed two five foot tall backsplashes which incorporated the mosaic design of the shower behind the two vanities.  Now proper waterproofing and peace of mind is the foundation of this beautiful bathroom!

Dimensions:  
TO THE TOP